Hardware Hooks P-029
Product Name: Hook, metal materail swivel snap hook, Hardware hooks
Item No: P-029 Hardware Hooks
Material: kirsite
Size: 3/4" 1"
Note: safety breakaway buckle,use for carrier/stroller.OEM is
welcome ,logo of your brand can be customized.
Mountaineering bags are used for packing goods.They are important equipment of traveling tools.
It is the one of five main traveling tools,like our climbing partner.
Travelers treat mountaineering bags as a friend.So,the accessories on the bags also very important.The material of the Brand bags are all pass very strict test.
The buckles of PA material,which produced by Jimei Buckle all can pass the standard inspections.
PRODUCT PROCESS
Buckle Products Manufacture
-
1. Original Imported Raw Materials
-
2. Mould Research & Development
-
3. Placing Mould into Injection Machine
-
4. Adjusting Products’ Index
-
5. First Finished Inspection
-
6. Mass Production
-
7. Patrol and Inspection
-
8. Second Inspection from Assemble Department
-
9. Surface Treatment
-
10. Package and Delivering
Choose JIMEI
Achieve Best Partner of Buckle Products
-
QUALITY ADVANTAGES
-
Products meet various safety standards
Pull: Max 220Kg Torque: Max 120Kg
Wallop: Max 2.5m Max 10Kg - The lifespan of JIMEI's product is over 10 years, which is 4 years longer than other brands
- Environmental-Friendly: Raw materials from Polly inJapan, DuPont USA are passed by SGS,ROHHS, REACH
-
Products meet various safety standards
-
Production Advantages
- Owned 61 advanced equipments, such as Injection Molding Machines, Engraving machines etc, 30 developing equipments, such as Cutting machines, Presses, Grinding Machines etc.
- Having over 1,300 types of product molds to ensure new styleand variety
- Accept OEM to shorten production cycle and improve more productions
-
Design Advantages
- JIMEI is familiar with process to keep and improve the products’quality with professional teams
- Owning over 100 design patents and launching 12 new design per month
- Punctual lead time: it is on time and usually takes 7-8 days to complete, 3-4 days for samples, 20 days for OEM only.